Site Development

Site development is carried from demolition and clearing through excavation, underground systems, permitting support, and final right-of-way restoration. The sequence is planned around access, erosion control, inspections, regulated disposal, and a clean turnover.

Demolition & Clearing

Structural and interior demolition, concrete removal, site clearing, permit coordination, debris export, and regulated-material handling for residential, commercial, and industrial work.

Grading, Excavation & Shoring

Precision excavation and grading, constrained-site production, shoring support, subgrade preparation, structural backfill, compaction, and finish grading.

Wet & Dry Utilities

Water, sanitary sewer, storm, electrical, low-voltage, and gas systems, including mainline extensions, detention and retention systems, mitigation, and sewer lining.

ROW Restoration

Sidewalks, curb and gutter, concrete street panels, asphalt, and ADA ramps restored from initial tear-out through surface match, inspection, and final cleanup.

Permitting & Erosion Control

Construction permitting support plus TESC and CESCL-led temporary erosion and sediment control through active construction and closeout.

Environmental Work

Contaminated-soil remediation, controlled export and disposal, dewatering and filtration, documentation, and methane-mitigation support under project-specific requirements.

Field Progress

Recent Work

Multifamily / Subterranean

Seattle Multifamily
Subterranean Earthwork

A zero-lot-line site package for a Seattle multifamily building with subterranean parking. The work moved through shoring and shotcrete walls, garage and elevator pits, complete underground utilities, sand-oil separator and pump systems, then SIP and right-of-way restoration. Every phase was sequenced around structural concrete, crane access, utility penetrations, and the limits of a constrained urban site.

0'
Setback to line
Full
Site + utility scope
Environmental Remediation

Contaminated
Site Restoration

An urban contaminated site was excavated and restored across private property and the public right-of-way. The work combined controlled dewatering and filtration, laboratory testing, segregated export of impacted soil, documented disposal, and SIP restoration under active agency inspection. Fire Marshal-controlled tank work and certified gas-free clearance were coordinated before removal.

2
Work areas
SIP
ROW restoration
Dewatering and treatment equipment at a contaminated urban excavation
Residential Infill

Seattle
Residential Infill

An existing home came down to make room for three new residences. The site package ran from demolition and frontage work through excavation, foundations, underslab utilities, backfill, and slabs.

1
House removed
3
New homes
ROW / SIP Restoration

Seattle Street
Panel Restoration

Full-depth concrete street panels and adjacent curb and gutter were restored in the Seattle right-of-way as part of an active SIP. The sequence covered removals, subgrade correction, forming, placement, surface matching, traffic control, and final cleanup for inspection and turnover.

SIP
Seattle ROW
Full
Panel replacement
Demolition

West Seattle
Teardown

A 1940s house and a mature landscape came down on a narrow lot with neighbors within twelve feet on both sides. Utilities cut and capped, debris sorted at the box, lot clean in four days.

4
Days on site
100%
Debris sorted
Excavator through the roofline
Komatsu working the rear of the structure
Cleared pad after demolition
Rock section placed and staked to line
Graded pad held off the neighboring house
Aerial of mass excavation
Machines staged on the pad
Cut face and haul route
Mass Excavation

North Seattle
Mass Ex

Full-lot mass excavation for a multi-unit build. Site balanced on the pad to cut export trucking, benched cuts held back off the property line, subgrade proof-rolled and turned over to the concrete crew on schedule.

2,400
CY moved
60%
Balanced onsite
Excavation & Foundation

Hillside
Addition

Hand-dug benched cut behind an occupied home, footing forms and underground lines set in the same pass, and a new retaining wall poured against the neighbor's grade. Access was one driveway wide the whole job.

12'
Access width
0
Neighbor claims
Hillside addition excavation and footing layout behind an occupied home
Hillside addition footing forms in a constrained residential site
Finished grade and stockpile
Aerial of a podium deck pour at dusk
Crew placing concrete over the mat
Pump and crane working the deck at night
Column cages and one-sided wall forms
Carpenters setting formwork
Structural Concrete

Urban Infill
Podium

A full-block mixed-use build on a busy arterial. Shored excavation to the property line, mat and column work, and a single-day podium deck pour that ran from dark to dark with lane closures coordinated with the city.

1 day
Podium pour
0'
Setback to line
Site Work & Restoration

Lakeside Trail
& Wetland

Public shoreline work in a protected wetland. Low-ground-pressure machines, imported structural section over geotextile, quarry spall edging, and grading pulled back to daylight the pond system — all inside a fenced critical-area buffer.

1,800'
Trail built
0
Buffer violations
Aerial of the finished shoreline trail
Track loader placing trail section
Finished trail with spall edging
Trail approach to the lake
Finished five-story mixed-use building
Drill rig setting shoring piles in the street
Rough-terrain crane delivered on a lowboy
Shotcrete wall and level-one structure
Rooftop framing above the skyline
Window install off a swing stage
Ground-Up Construction

Ground-Up
Mid-Rise

Five stories over a concrete podium on a corner lot with occupied buildings on two sides. Secant shoring drilled from the street, shotcrete walls, framing, envelope, and finishes — from the first pile to keys in hand.

5
Stories delivered
2
Occupied neighbors

Your lot